24 July 2009

A post for Mum & Dad

No exciting pictures this week, but don't fear, work is still being done!
The wardrobe shelves went in this week & Brad came and bricked up the bath and shower hobs. The tiles arrived and we had a meeting with our site supervisor. He says that all going well we should have the keys in our hot little hands 8 weeks from now. So Mum & Dad, sorry to tell you, but 8 weeks from now is beginning October-ish..... so you best be bringing some paintbrushes back in those suitcases of yours :)
So Big Brother Brad, the bestest tiler ever came to start some work.... and he liked all our tile choices! Thank god! After much worrying over my colour choices it was nice to have a professional think we had made good choices!

Hi Mum & Dad!! Hope you guys are enjoying yourselves and having a great time!! xxx

15 July 2009

A sigh of relief....

The kitchen, bathroom & laundry cabinets & benchtops are all in!! I got the shock of my life when I went there today after work. It is moving along so fast. I was beside myself with excitement when I saw the new kitchen.
And a HUGE sigh of relief seeing all our colour choices put together. It was a stressful time choosing all the colours and hoping that they would look good when all put together in the big picture. But I LOVE IT!! Still curious about the final product of the bathrooms when the tiles go down though!
2nd Bathroom
Main Bedroom Ensuite


Laundry

09 July 2009

Locked up!!

The house is locked up!!
Unfortunately this means no access for us inside, so the next few weeks of pics will be through windows, but that's ok, because it means it's getting closer to finishing!!!

The front doors will be stained 'cedar'

05 July 2009

Windows & ceilings

The windows have been installed and all of the ceilings done. Our site supervisor tells us the doors will arrive on Wednesday and be locked up!! Brad will be coming in to do the tiling in approx 3-4 weeks, and then it should be about 4-6 weeks after that and it will be finished!!!