22 April 2009

The frames start going in

Today we had our first site meeting with the site supervisor. All going well so far. The frames are going in and the brickies are moving along at a fast rate. The site supervisor gave us a 5 month build time!!!

This is the theatre room taking shape. And don't worry the door isn't bent in that funny angle. it's just something my camera has done!


The back double sliding door leading onto alfresco


Back wall


Inside... main room



Side wall.... bedrooms


Inside side wall... bedrooms